Environmental programme, 2008 to 2011 – What are our plans for the future?

Goal Action/Measure Indicator that goal has been achieved Responsibility Completion date¹
Resource consumption
Reduction of resource consumption by 3% relative to production volume (for energy: relative to production volume and building area) Implementation of innovative technology in the form of magnet condensers Energy conservation of approx. 35,000 – 40,000 kWh/a compared to conventional equipment Engineering 2009
Implementation of a new generation of PCs with greatly reduced energy consumption, material usage and noise emissions 60% reduction in energy consumption, 8.3 kg of materials saved per PCC IT 2011
New high-pressure container cleaning equipment Reduction in consumption of water and cleaning agents relative to current cleaning processes Manufacturing 2009
Use of treated wastewater for evaporative cooling in the heat exchanger of the chillers Amount of drinking water conserved that would be used if no grey water were available Engineering 2010
Emissions
Reduction of emissions Selection of modern fuel-saving models for the fleet of vehicles Average CO2 emissions of the motor pool: 140 g/km Head of sales representatives 2011
Fuel conservation training Training sales representatives, fleet drivers, commuters and other interested parties Environmental Officer 2008
Promotion of environmentally compatible transportation choices Acquisition of electric bicycles 3 electric bicycles purchased Engineering 2011
Provision of replacement parts and repair supplies for bicycles Existing emergency bicycle toolkit available for employees Engineering 2008
Organisation of a bicycle repair course Bicycle repair course held for interested participants Environmental Officer 2011
Establishment of a ride sharing platform Platform is available in the intranet IT 2008
Wastewater
Maximum treatment of process wastewater Use of biological wastewater treatment system Analysis of processed wastewater indicates values fall far below permissible limits Engineering 2009
Process optimisation
Optimised handling of hazardous materials and wastes Expansion of the inventory control system to include automatic labelling of hazardous materials and wastes System successfully expanded Hazardous materials officer
Waste material officer
2009
Promotion of organic farming
Transition of raw materials not currently available in the required qualities to organic Transition of castor oil to organic quality Castor oil from certified organic sources fulfils the quality requirements and can be used as a raw material Acquisition of raw materials 2008
Communication and information
Increasing awareness amongst employees New intranet design: environment, hazardous materials, disposal New intranet concept generated Environmental Officer 2008
New concept for training and introducing new colleagues to environmental protection at WALA Training “Introduction for new employees” carried out, additional dates planned Environmental Officer 2008
New concept for department-specific training regarding environmental protection at WALA Department-specific training concept generated Environmental
Officer
2009
Development of an activity-specific training programme Training database has been established and is being used Environmental
Officer
2010
Campaigns to inform employees about environmental issues 4 campaigns per year conducted Operative Environmental Committee 2008-
2011